Substations in Bangladesh: cost, rules, installation

An 11/0.4 kV substation takes the utility's high-voltage supply and turns it into the 400/230 V your building or factory uses. We design, supply, install and get it approved.

Indoor substation room with HT switchgear, a transformer behind a mesh barrier and an LT panel
Illustrative image

What a substation includes

  • HT switchgear

    VCB or ring main unit to switch and protect the 11 kV side.

  • Transformer

    Oil-immersed or dry-type, sized to your demand.

  • LT panel (PCC/MDB)

    Main breaker and outgoing feeders to each floor or section.

  • Power factor correction

    PFI or APFC panel to keep power factor up and bills down.

  • Cables and trays

    HT and LT cables sized for current and fault level.

  • Earthing and safety

    Earth pits, rubber mats, barriers, fire extinguisher and signage.

Does your building need its own substation?

Whether your building needs its own substation depends on load; we check it at survey.

Free site survey

Indoor or outdoor

  • Outdoor

    Pole-mounted or plinth-mounted in a fenced yard. Lower civil cost where you have space.

  • Indoor room

    A ventilated ground-floor room, common in Dhaka buildings. Needs fire safety and cable trenches.

  • Compact substation

    HT, transformer and LT in one enclosure. Fast to install on tight sites.

How a substation job runs

  1. 1Site survey and load list
  2. 2Single-line diagram and layout drawing
  3. 3Written fixed quote
  4. 4Utility application and OCEI approval filing
  5. 5Civil work, installation and cabling
  6. 6Testing, inspection and energising

Frequently asked questions

When does a building need its own substation?

It depends on the building's load. We calculate your demand at the survey and tell you whether you need your own substation.

Indoor or outdoor substation: which is better?

Outdoor is usually cheaper if you have space. Indoor rooms suit city buildings with no spare land, but need ventilation, cable trenches and fire safety. Compact substations save space on tight sites.

How long does a substation take?

It depends on equipment lead time, civil work and approvals. Your written quote includes a dated schedule.

Get a written, fixed quote after a free site survey

An engineer visits, measures your load and explains what you need. You get a written quote with line items before any work starts.