Substation cost in Bangladesh: what you pay for

Two substation quotes for the same kVA can differ by lakhs of taka. Usually it's because they don't include the same things. Here is every line item, what it covers and what makes it vary.

Indoor substation room with HT switchgear, a transformer behind a mesh barrier and an LT panel
Illustrative image

Cost line items

ItemWhat it coversWhat makes it vary
TransformerThe transformer, delivered, with test certificatekVA, copper or aluminium, losses, brand, warranty
HT switchgearVCB or RMU, protection relays, HT meteringVCB vs RMU, brand, indoor or outdoor type
LT panelPCC/MDB with main breaker and feedersNumber of feeders, breaker brand, busbar rating
CablesHT and LT cables, glands, lugs, terminationsDistance, cable size, copper price
Room / civilPlinth or room, fence, trench, oil soak pitNew room or existing space, site access
EarthingEarth pits, strips, testingSoil type, number of pits, lightning protection
Approval feesOCEI approval and utility chargesUtility, load, connection type
CommissioningTests, inspection support, energisingTest scope and documentation

Why quotes differ by lakhs

  • One quote is transformer-only, the other is installed and approved
  • Aluminium winding priced against copper
  • VCB in one quote, drop-out fuse in the other
  • Cable sizes or lengths cut short to look cheaper
  • Civil work, earthing or approval fees left out and billed later
  • No test certificate or warranty terms

Quote-comparison checklist

Print this list and tick it against every quote you receive. If a quote can't answer a line, ask the contractor before you sign.

Open the checklist

How long it takes

The timeline depends on equipment lead time, civil work and the approval process. Your written quote includes a dated schedule.

Frequently asked questions

What does a substation cost?

It depends on kVA, the HT switchgear type, cable lengths, civil work and approvals. Use the line items on this page to compare quotes, and ask us for a written quote after a free survey.

Is civil work included in a substation package?

Not always. Some quotes leave out the room, plinth, trench or oil soak pit and bill them later. Check the civil line in every quote.

Why is one quote so much cheaper than another?

Usually because it leaves something out: approvals, earthing, civil work or the right cable size. Use our checklist to compare like with like.

Get a written, fixed quote after a free site survey

An engineer visits, measures your load and explains what you need. You get a written quote with line items before any work starts.