Skip to content
[HOTLINE]
WhatsApp
MICROTEKENGINEERING

Factory electrical EPC: substation to panels

We take a factory from the utility connection to the last machine: design, supply, installation, approval and maintenance, by one licensed team.

Garments factory floor with overhead cable trays and an engineer checking the busbar trunking
Illustrative image

Scope

  • Substation

    11/0.4 kV substation with VCB or RMU, transformer and metering.

  • PCC / MDB

    Main panels with breakers, metering and feeder protection.

  • Busbar trunking

    Overhead power distribution for production floors.

  • Cable tray

    Tray, ladder and trunking routes, neatly dressed and labelled.

  • Earthing & lightning protection

    Earth grid, pits and lightning protection, tested and recorded.

  • APFC

    Automatic power factor correction to cut kVA demand and losses.

  • ATS

    Automatic transfer between utility and generator supply.

Process

  1. 01

    Survey and load study

    Machine list, existing supply and future expansion.

  2. 02

    Design

    Single-line diagram, panel schedules and cable sizing.

  3. 03

    Fixed quote

    Line items with brands and specifications.

  4. 04

    Approvals

    Utility application and OCEI approval filing.

  5. 05

    Installation

    Planned around your production to limit downtime.

  6. 06

    Testing & handover

    Thermography, insulation and earth tests, with reports.

Engineer pointing a thermal camera at an open PCC panel
Illustrative image

By sector

Garments

Long production floors with many sewing machines need balanced phases, overhead busbar or tray, and good lighting.

  • Busbar trunking for flexible machine layouts
  • Phase balancing across lines
  • Lighting circuits separated from machines
  • Compliance-ready test records

Textile

Spinning, knitting and dyeing loads run continuously with big motors, so power factor and cable heating matter.

  • APFC sized for motor loads
  • Motor control centres
  • Cable sizing for continuous load
  • Thermography in every AMC visit

Warehouse & cold storage

Compressors and lighting run around the clock. Reliability and back-up change-over are critical.

  • ATS with generator change-over
  • Dedicated compressor feeders
  • Energy-efficient LED lighting
  • Planned maintenance

Light manufacturing

Mixed machine loads, often in rented sheds, need flexible distribution that can move with the business.

  • Modular DBs and sockets
  • Three-phase upgrade with the utility
  • Earthing for machine bodies
  • Room to grow in the design

Licence and project proof

We hold an OCEI electrical contractor licence. See our licence details and real project records before you decide.

OCEI licence [OCEI_LICENCE_NO]

Keep it running with an AMC

Most factory faults start as a hot joint or a weak earth. A maintenance plan finds them before they stop production.

AMC & emergency

Areas we serve

Gazipur, Tongi, Savar, Ashulia, Narayanganj, Dhaka and Chattogram/EPZ.

Frequently asked questions

How long does factory electrical work take?

It depends on scope, equipment lead time and approvals. We plan installation around your production and give a dated schedule with the quote.

Can you work while the factory is running?

Yes. We plan shutdowns for weekends or off-shifts and keep them as short as possible.

Do you provide test reports for compliance audits?

Yes. We hand over test reports, single-line diagrams and as-built drawings at handover, and after every AMC visit.

Get a written, fixed quote after a free site survey

An engineer visits, measures your load and explains what you need. You get a written quote with line items before any work starts.