50 kVA transformer: price, load and use

A 50 kVA transformer is the smallest size most people install for their own supply. It suits a site where the running load stays around 40 kW or less, such as a small workshop or a cluster of shops. It is often pole-mounted, so it needs little civil work.

Load it serves
about 40 kW
Installed price range
On written quote
Pole-mounted distribution transformer beside a street, with linemen in safety gear
Illustrative image

Load it serves

At 0.8 power factor, a 50 kVA transformer delivers about 40 kW. We usually plan for 20–25% headroom so it doesn't run hot at peak and you have room to add machines.

Typical use

Small workshop, poultry or agro unit, a row of shops.

How many kVA do you need?

Installed cost: what you pay for

A 50 kVA quote should list each of these items. If a line is missing, ask why.

  1. 1

    Transformer

    Brand, winding material, tested losses, warranty.

  2. 2

    HT side

    VCB, RMU or drop-out fuse, HT cable and metering as the utility requires.

  3. 3

    LT panel

    Main breaker, outgoing feeders, meters and protection.

  4. 4

    Cables and termination

    Correct size for the current, with proper glands and lugs.

  5. 5

    Civil work

    Plinth, room or fence, cable trench and oil soak pit where needed.

  6. 6

    Earthing

    Separate earth pits for the neutral and the body, tested and recorded.

  7. 7

    Approvals and utility work

    OCEI approval and the utility's connection process.

  8. 8

    Testing and commissioning

    Insulation, ratio and earth tests, with a written report.

Substation cost breakdown

Room and plinth space

At this size the transformer is often pole-mounted, which needs little ground space. If it sits on a plinth, it needs a fenced area with safe clearance. We measure and mark the location at survey.

Approvals needed

  • Utility application for the new or increased connection
  • Substation design and drawing approval from the Office of the Chief Electric Inspector (OCEI)
  • Inspection before the supply is switched on
  • Building owner or landlord consent where the site is rented
How OCEI approval works
Engineers measuring with a clamp meter and a laser distance meter in a building service room
Illustrative image

Frequently asked questions

How much load does a 50 kVA transformer run?

About 40 kW at 0.8 power factor. In practice we keep 20–25% headroom, so plan for a steady demand a little below that.

Can I add more load later?

Yes, if you leave headroom now. If you expect to grow, compare the next size up. A transformer that is far too large still has fixed losses every month.

What approvals does a 50 kVA installation need?

Usually a utility application for the connection and substation approval from the Office of the Chief Electric Inspector (OCEI), followed by inspection before switch-on. We prepare and file the paperwork with you.

Is the price on your quote fixed?

Yes. Our written quote lists every line item with brands and specifications. It only changes if you change the scope.

Get a 50 kVA quote

An engineer visits, measures your load and explains what you need. You get a written quote with line items before any work starts.