Substation quote-comparison checklist

Tick each line for every quote. A good quote answers all of them in writing.

#Quote 1Quote 2Quote 3
1Transformer kVA, brand, winding material (copper or aluminium)
2No-load and load-loss figures from the routine test certificate
3Standard (BDS or IEC) and warranty period
4HT switchgear type: VCB, RMU or drop-out fuse, and brand
5HT metering as required by the utility
6LT panel: main breaker rating and brand, number of feeders, busbar rating
7HT and LT cable sizes, lengths and brand
8Civil work: plinth or room, fence, trench, oil soak pit
9Earthing: number of pits and tested resistance
10Power factor correction (PFI/APFC) included or not
11OCEI approval filing and utility application included or not
12Approval and utility fees: included, estimated or excluded
13Testing and commissioning scope, with a written report
14Single-line diagram and as-built drawings at handover
15Payment schedule and completion date