A load increase raises the sanctioned load on your meter. The utility handles the meter side. Your own wiring, MCB and DB must also be able to carry the new load.

Technician with insulated tools at a three-phase meter board on a residential building
Illustrative image

Steps

  1. 1

    Work out the new load

    List your current and planned appliances: ACs, water heater, lift, pump, machines.

  2. 2

    Check the wiring

    Make sure cables, MCBs and the DB can carry the higher current.

  3. 3

    Apply to the utility

    Submit the load increase application with your account details and documents.

  4. 4

    Inspection and payment

    The utility inspects and issues a demand note for any charges.

  5. 5

    Meter change

    The utility updates or replaces the meter for the new load.

Wiring check before you apply

A load increase on old wiring is a fire risk. We check your cables, DB and earthing first and tell you exactly what must change.

Free site survey

Frequently asked questions

Do I need to change my wiring when I increase load?

Often, yes. If the main cable, MCBs or DB can't carry the new current, they must be upgraded before or along with the load increase.

My MCB trips when the AC starts. Do I need a load increase?

Maybe, but the wiring or MCB rating may also be the problem. We check both before you apply.

When do I need three phase?

Usually when you add large ACs, a lift, pumps or machines. We work out what you need at survey.

Get a written, fixed quote after a free site survey

An engineer visits, measures your load and explains what you need. You get a written quote with line items before any work starts.