Skip to content
[HOTLINE]
WhatsApp
MICROTEKENGINEERING

DPDC new connection: steps, documents, fees

Dhaka Power Distribution Company (DPDC)

Homeowner and engineer going through connection documents at a dining table
Illustrative image

Area served

Central and southern Dhaka and nearby areas. Check the utility name printed on your current bill or a neighbour's bill.

Steps to get connected

  1. 1

    Check eligibility

    Confirm the utility for your address and the load you need.

  2. 2

    Apply

    Submit the application with documents, online where the utility offers it.

  3. 3

    Site inspection

    The utility inspects the wiring, meter position and supply point.

  4. 4

    Demand note and payment

    Pay the charges listed in the utility's demand note.

  5. 5

    Meter installation

    The utility installs the meter and switches on the supply.

Document checklist

These documents are commonly requested. Tick them off as you collect them.

Tick each document as you collect it. Your ticks stay on this device only.

The exact list is on the utility's citizen charter. We confirm it before we file.

Fees

Fees change. We confirm the current fee from DPDC's citizen charter when we prepare your file.

Common delays

  • Name on the ownership papers doesn't match the applicant
  • Wiring or meter board not ready at inspection
  • Missing building plan approval or holding tax receipt
  • Load applied for is lower than the real load
  • Local transformer capacity needs an upgrade first

Official portal

DPDC official website

We check this against the official source before each job. Confirm with us at survey.

Technician with insulated tools at a three-phase meter board on a residential building
Illustrative image

We coordinate the application and wiring

We get your wiring, meter board and DB ready, help with the application and follow up until the meter is installed. You deal with one team.

Free site survey

Frequently asked questions

How much does a DPDC new connection cost?

Fees depend on the connection type and load, and they change. We confirm the current fee from DPDC's citizen charter when we prepare your file.

How long after applying will I get the meter?

It depends on how complete your documents are, the inspection date and meter availability. Most delays come from missing papers, which we help you avoid.

Can I apply online?

DPDC offers an online application route. We help you fill it in and upload the right documents.

Get a written, fixed quote after a free site survey

An engineer visits, measures your load and explains what you need. You get a written quote with line items before any work starts.